Frequently asked questions
Straight answers about costs, permits, timelines and how we work. Don’t see your question? Give us a call.
The basics
Call us at (818) 590-8588 or send a few details through our estimate form. We’ll set up a free site visit and consultation, talk through your goals and budget, and follow up with a detailed written estimate.
Yes. SD Build Co is a licensed, bonded and insured general contractor, CSLB General B License #1136451. You can verify our license anytime on the CSLB website.
Yes. As a design-build contractor, we plan the layout and finishes, prepare and submit the permit drawings, respond to city plan-check comments and schedule every inspection. You work with one team instead of coordinating several.
Every project starts with a detailed written contract. Payments are tied to permit inspections: each payment comes due as the project passes its city inspection, so you’re only paying for work that’s been completed and signed off.
We work across Southern California, from Los Angeles to San Diego, with most of our projects in San Diego County.
Ground-up builds
Yes. New Homes is one of our specialties. We build new homes on open lots and replace existing homes, with in-house architects, structural engineers and interior designers working alongside our construction team from day one.
Yes. Our in-house architects and structural engineers prepare the plans and engineering, our interior designers help with layout and finishes, and we handle permits and inspections throughout the build, so you have one team and one point of contact.
Size, design complexity, site conditions such as slope, soil and utility connections, your finish selections and city fees. We’ll give you a detailed written estimate after reviewing your lot and plans.
It depends on the size of the home, the design and the permitting timeline. We’ll walk you through a realistic schedule with your estimate.
More space
Most projects range from about $100,000 to $300,000, depending on size, finishes, and whether it’s a detached ADU or a garage conversion. We’ll give you a detailed estimate after a free site visit and consultation.
A detached ADU gives the most privacy, an attached ADU connects to your home, and a garage conversion reuses an existing structure and is often the most affordable. We’ll compare the options for your lot, budget and how you plan to use the space.
Yes. ADUs and garage conversions require permits. We handle the entire permitting process so your project complies with local zoning and building codes.
Every ADU and garage conversion is different, so the timeline depends on the project scope, design and permitting. We’ll lay out a schedule based on your plans once the scope is set, and keep you updated at every step.
Generally, yes, for rentals longer than 30 days. Short-term vacation rentals usually aren’t allowed. Rules vary by city, so we’ll confirm what applies to your address.
Generally, no. California doesn’t require owners to live on the property to build an ADU. Junior ADUs, which are built within the main home, have different rules.
Additional bedrooms and bathrooms, sunrooms, home offices, expanded kitchens and second stories, each designed to blend with your existing home.
Kitchens
Usually, if the work touches electrical, plumbing, walls, windows or the layout. Purely cosmetic updates, like paint or new cabinet doors, often don’t. We’ll tell you exactly what your project needs and handle the permit for you.
Most kitchen remodels take about 3 to 6 weeks of construction, depending on the scope and material lead times. Making your selections early is the best way to keep the schedule on track, and you’ll get a clear timeline before work begins.
Most clients do. We seal off the work area from the rest of the house to keep dust and debris contained, and we clean up at the end of each day.
Quartz is the easiest to care for, and granite and porcelain are also very durable. We’ll walk through samples with you and match the material to how you cook, the upkeep you want and your budget.
Bathrooms
Replacing fixtures in the same spot usually doesn’t require one. Moving plumbing, adding circuits or changing load-bearing walls does. Removing or moving a non-load-bearing wall typically doesn’t require a permit. When a permit is required, we pull it and schedule the inspections.
Most bathroom remodels take about 2 to 4 weeks of construction, depending on the design and materials. You’ll get a realistic timeline with your estimate.
It depends on who uses the bathroom and your resale plans. A common approach is a walk-in shower in the primary bath and a tub kept in a secondary bath. A low- or no-threshold shower is also one of the most popular accessibility upgrades.
Tub-to-shower conversions, primary bathroom remodels, walk-in showers, new fixtures and vanities, accessibility upgrades, and cosmetic refreshes for homes across Southern California.
Whole home
One team handles the design, budget, permits and construction, so pricing and decisions stay aligned and you have one point of contact instead of coordinating a designer and a contractor separately.
Yes. We map out the full vision up front, then build in stages that fit your budget and schedule, sequenced so finished areas aren’t disturbed by later work.
Often, yes, especially when the work is phased. If the kitchen, bathrooms or utilities are all being worked on at the same time, you may want to stay elsewhere for part of the project. We’ll plan that with you before work begins.
It depends on the scope, permit review and material lead times. We provide a clear, realistic schedule up front and keep you updated as the work progresses.
The details
SD Build Co is fully insured, with coverage of $1,000,000+.
Still have questions?
Free estimate
Tell us about your project and we’ll reach out to schedule your free, no-obligation estimate.